References

Extension of MANN+HUMMEL Industrial Complex, Uhersky Brod

Project Details

Client:

MANN HUMMEL Innenraumfilter GmbH (CZ) s.r.o.

Project Description

The extension of the MANN+HUMMEL production facility in Uhersky Brod (Phase II) represents more than just a technically demanding construction project. It is an undertaking that unites sustainability, high-quality working environments, and sophisticated industrial architecture – values that exceed conventional industrial construction standards.

The architectural concept for this facility extension, incorporating new administrative premises, gatehouse, and car park, builds upon the original production complex from 2014 – not only visually but also in the spirit of collaborative partnership.

DELTA Group Services

  • Architecture
  • Lead Designer
  • Project Management
  • T Supervision
  • Digitalisation of Construction Processes – PlanRadar Platform

 

Key Project Data

  • Design Development Phase (Extension): 7/2021–2022
  • Construction Phase: 6/2023–12/2024
  • Car Park (Design/Construction): 2024–2025
  • Original Production Hall Area: 4,780 m² (Phase I – 2014)
  • New Production Hall Area: 3,450 m² – capacity increase of approximately 70% of original production floor area (Phase II – 2024)
  • Administrative Building Area (3 floors): 965 m²
  • Car Park Capacity: 65 new parking spaces (Phase III – 2025)

Project Highlights

  • Industrial architecture with human-scale proportions
  • Building Design: Aluminium façade systems in various configurations – cassette panels, profiled sheeting, composite sandwich panels
  • Kopilit: Glass profile system with industrial heritage – combining aesthetics with functionality (natural lighting, thermal comfort)
  • Canopy Structure: Self-supporting design creating water curtain effect during rainfall
  • Enhanced Security Focus: New gatehouse facility separating heavy goods vehicle circulation from pedestrian traffic
  • Construction execution without operational interruption, requiring sensitive coordination of construction activities and site logistics

 

Energy Concept and Sustainability

  • Comprehensive energy system modernisation – implementation of high-efficiency air-to-air and air-to-water heat pump systems as primary heating and cooling sources
  • Energy Independence – disconnection from gas supply network in accordance with European decarbonisation trends
  • Advanced heat recovery systems from mechanical ventilation installations for maximum utilisation of waste heat
  • Solar thermal system for domestic hot water heating support
  • LED lighting systems throughout all areas for minimised electrical energy consumption
  • Water-efficient sanitary installations as part of sustainable water management approach

 

Client Statement

“Throughout our long-standing collaboration spanning seven different construction projects expanding our MANN+HUMMEL production facility, the DELTA Group team has become an indispensable and trusted partner for us.” “Your ability to combine technical expertise with flexibility and openness to innovative solutions has enabled us to achieve excellent results in construction together.”

Bernd Oetinger
REAL ESTATE MANAGEMENT
MANN+HUMMEL GmbH

 

Photo: DELTA Group CZ | © Jiří Alexander Bednář

Please do not hesitate to contact us