Takeda Innovation Capability Center, Bratislava
Project Details
- High-tech offices that have the potential to change the world
- The most technologically advanced flagship of the Takeda pharmaceutical group – a prestigious innovation base for top talent in data and digital technologies
- Mixed Reality as a useful tool in planning and implementing a construction project
Client
Takeda Pharmaceuticals Slovakia s.r.o.
Data
- Type of construction: Interior in the reconstructed building of the national cultural monument
- Total rental area of the Pradiareň 1900 building: 14 870 m2
- Total rental floor area of the premises leased by Takeda: 3. 950 m2
- Open- plan offices with use of the mezzanine
- Generous space with the ceiling height at 4.51 metres
- Design and architectural work: 06/2021 – 10/2021
- Construction start: 10/2021
- Commissioning: 3/2022
- The interior is functionally divided into an “open office” and a mezzanine space that has two separate sections. The office area includes various hybrid workstations, meeting spaces, reception, gathering and breakout areas, technical and sanitary facilities and a unique coffee point.
DELTA’s services
- Architecture from the position of a local architect
- Elaboration of interior implemention project
- Architect’s supervision activities in the construction process
- BIM: Creatingof an accurate 3D model of the allocated space based on laser scanning
- Virtual tour of the proposed space already during the conceptual design phase
- Digitisation of coordination and processes
- Coordination of subcontractors
- Mixed reality: using Fit-Out model in Shell and Core apps with HoloLens2 – demonstration: https://www.youtube.com/watch?v=i1TiNv2erF0
Special features
- Reconstruction of a brownfield Pradiareň 1900 into a technologically ultra-modern office premises supporting development and innovation
- The Project was implementedin in accordance with Takeda’s commitment to environmental sustainability including carbon neutrality – environmental certification BREEAM buildings
- The Investor’s emphasis on the use of low-emission materials
- Use of 3D scanning and Mixed Reality on the construction site