Gradačac Water – Project Implementation including Procurement and Engineering Supervision

Project Details

Client:

Municipality of Gradačac / Public Communal Enterprise “Komunalac”

Project Data:

Investment budget: EUR 13.5 million

DELTA Services:

  • Support to PIU
  • Design
  • Design Review
  • Procurement and Construction Supervision
  • FIDIC Red Book

Description

The European Bank for Reconstruction and Development (EBRD) provided a loan of up to EUR 6.0 million to the Public Utility Company Komunalac, in the City of Gradačac, responsible for water and wastewater services, to be co-financed by grants of up to EUR 13,5 million from international donors (SIDA, CRA and WBIF) and co-financing of the the Gradačac City government.

  • Construction of 2 wells (capacity cca 100 l/s), control command facility and procurement and installation of chlorination equipment;
  • Replacement of existing asbestos-cement pipelines and pipes with insufficient profiles in the urban part of the town of Gradačac (cca 40 km) ;
  • Reconstruction of central reservoir Skorici, 1.500 m3;
  • Construction of 5 pumping stations in the new southern water supply system and of 5 booster pumping stations in the new southern water supply system;
  • Construction of 6 reservoirs in the new southern water supply system;
  • Construction of water distribution networks to be connected to the southern system (cca 80 km);
  • Construction of wastewater collection system for 4 communities in northern area, pipelines of 20 km and 7 wastewater pumping stations;
  • Assessment of the level of utilisation of the existing water supply network and modification of the detailed design for a new water supply network in the southern part of the municipality.

 

Scope of Services:

  • Support to the Project Implementation Unit (PIU) throughout the entire duration of the project
  • Advise the PIU/Company on procurement strategy,
  • Design review and detailed design,
  • Assist the PIU/Company to prepare tender documents inclusive technical specifications and requirements for 5 Works Contracts (with more Lots) and one Supply Contract; support during the procurement process,
  • Assist the PIU/Company with drafting the contract with the winning tenderers, FIDIC Conditions of Contract, Red Book and contract administration,
  • Provide full supervisory services during construction in accordance with valid BH laws and Red FIDIC Conditions of Contract of the following scope of works:
    1. Construction of new pressure and distribution pipelines and networks – cca 94 km;
    2. Construction / installation of water supply facilities, including: Domažić well field, pumping stations and water tanks;
    3. Reconstruction of existing water supply pipelines and network – cca 45 km;
    4. Reconstruction and extension of the sewerage system – cca 25 km;
  • Procurement of leak detection equipment and measuring equipment.

 