References

EurothermenResort Bad Schallerbach

Project Details

Client

EurothermenResort Bad Schallerbach GmbH

Facts

EurothermenResort:

  • Construction Period 24 months
  • Gross floor area: 15,000 m2
  • 4,300 m2 therapy area
  • 2,500 m2 spa baths and hotel
  • 2,000 sun loungers
  • 600 parking spaces

 

Park photovoltaic system:

  • Project durationt: 10/2022 – 06/2024
  • May 2024: Opening of the largest car park photovoltaic system in Upper Austria with 2,887 photovoltaic modules (= approx. 6,000 square metres)
  • Construction costs of the solar park totalling 3.8 million euros

Special features

November 2024: Upper Austrian Environment and Sustainability Award 2024 for the solar park at Eurothermen Bad Schallerbach

DELTA Services

  • Project management
  • IT-Services
  • Project planning
  • Local construction supervision

 

Project photos: © EurothermenResorts
Photo car park photovoltaic system: © DELTA
Photo award: © Province of Upper Austria

Please do not hesitate to contact us