LKH Rudolfstiftung, Neubau Allgemeine Psychiatrische Abteilung Juchgasse 22
Client
- Wiener Krankenanstalten Verbund
Project Data
- Investment budget: 66.300.000 €
- 13.393,54 m² net floor area
DELTA services
- Project Controlling and Monitoring
- Control of management and organisation
- Ensuring an efficient project setup and project flow structure
- Ensuring continuous project documentation (follow-up control)
- Control of design – implementation of user requirements, compliance with technical standards
- Contract management
- Procurement (strategy): advice and control, compliance with legal regulations
- Cost control – ongoing target / actual cost analysis
- Quality control, including periodic on-site inspections – ensuring the required quality
- Deadline control – ongoing target / actual analysis
- Advice and control of change management
- Invoice verification
- Examination of contract addenda
- Support for anti-claim management
- Advice and participation in the handover process
- Licensed Engineer
- Confirmation of completion notification
- Confirmation that the building corresponds to the building permit
Description
Reconstruction during ongoing operation.
The City of Vienna / Wiener Krankenanstalten Verbund is the owner of the property in 1030 Vienna, Juchgasse 22. A nursing school was located on this property, which was moved to the Kaiser-Franz-Josef-Spital at the beginning of the autumn semester 2010. In order to give this property a new use, the City of Vienna / Wiener Krankenanstalten Verbund have decided to build a new property after the nursing school was demolished. The following functional areas will be carried out in the new property, which will be constructed in a low-energy mode: New building of the Juchgasse 22 hospital, General Psychiatric Department, including connection to the main building, construction and installation of a Data Center, and an underground car park with 125 parking spaces. The General Psychiatric Department contains the following functional areas: 2 general psychiatric wards, 1 gerontopsychiatric ward, a day clinic, a therapy center, a psychiatry outpatient department, a pain outpatient department, a neurological outpatient department, a neurosurgical outpatient department and a clinical psychologists department.
The hospital has a net floor area of approx. 13,393.54 m2 and 66 systemised beds.
Particularities
- Low-energy construction
- Data Centre