Facts
- Reconstruction of the administrative building BBC 4
- Construction time: 10/2017 – 9/2019 (24 months)
- Office space: 19.000 m²
- Floors: 13
- Garage spaces in the basement
- Investment costs: approx. 480.000 EUR
DELTA services
- Technical supervision of the client
- Consultancy and accompaniment of the client
Special features
- Replacement of all basic building technologies (cooling, air conditioning, fire safety measures, new electrical wiring)
- Technical measures to improve the statics of the building – state-of-the-art technologies to reinforce the skeleton of the external and internal structure of the building, including the ceilings
- Replacement of all 6 lift cabins
- Emphasis on maximum building safety