References

Pressburg Tower Bratislava

Project details

Client

UCTAM SVK s.r.o.

Facts

  • Reconstruction of the administrative building BBC 4
  • Construction time: 10/2017 – 9/2019 (24 months)
  • Office space: 19.000 m²
  • Floors: 13
  • Garage spaces in the basement
  • Investment costs: approx. 480.000 EUR

DELTA services

  • Technical supervision of the client
  • Consultancy and accompaniment of the client

Special features

  • Replacement of all basic building technologies (cooling, air conditioning, fire safety measures, new electrical wiring)
  • Technical measures to improve the statics of the building – state-of-the-art technologies to reinforce the skeleton of the external and internal structure of the building, including the ceilings
  • Replacement of all 6 lift cabins
  • Emphasis on maximum building safety
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.